All major building projects over 40 ft. Need a site safety manager with OSHA 30 certification and a project information panel.A building permit must be obtained to remediate the structurally unsafe condition within ten days of violation receipt. Fill shall be free of organic material and construction debris. Fire safety during construction shall comply with the applicable requirements of this code and the applicable provisions of the Philadelphia Fire Code. Follow these steps to file a complaint: 1. Fill out the General Safety Law Complaint Form (LIBI 28). OSHA sets standards and regulations that every construction company must follow. 3302.5.2 Filling and grading. Subpart M lays out the requirements and criteria for fall protection in construction workplaces.