The insurance carrier for the Subcontractor must have an A.M Best Rating of A- or better and the rating must be listed in the Certificate of Insurance. This Agreement is entered into as of the date set forth herein between La Center School District.DRAWINGS​: Designer's drawings are conceptual in nature and are intended to set forth design intent; they are not to be used for architectural or engineering. How do I fill this out? To fill out this document, first gather all required information such as your company details and insurance information.