The policy outlined below establishes electronic plan, document, and signature submittal guidelines. Construction Documents (Stamped and Signed) up to two full size sets. 10.For construction services, document an attempt at a third bid, if not obtained. Bids must estimate both costs and the time required to complete services. Per Port of Oakland provisions,. Final Payment WILL NOT be made until this form is properly filled out and submitted to the Port of Oakland.