To reduce particulate matter air pollution, all types of outdoor fires are prohibited in Maricopa County, except for fires that are specifically allowed by Rule 314.
Building permits are required for all structures with the exception of a structure that is less than 200 square feet with no electrical, plumbing or mechanical.
Why do I need a Permit? Residential Work – Decks, garages, ALL type of fences, culverts, water heaters, fireplaces, pools & pool barriers, patio enclosure, etc.
Noise Ordinance (P-23) Therefore, it is hereby declared to be the policy of Maricopa County to prohibit excessive, unnecessary, disruptive, and annoying noises from all sources. The Sheriff's Department is responsible for enforcement of the Maricopa County Noise Ordinance (PDF).
Construction work (non-residential): All construction work in Commercial and Industrial zones not within 500 feet of Rural or Residential zones as per the Maricopa County Zoning Ordinance, or within any zone but not within 1,500 feet of an occupied residence, shall not begin prior to a.m. and must stop by ...
It shall be unlawful and a violation of this chapter to conduct or permit any activity, or to produce, create or allow any noise beyond that person's property boundary or on a public street or highway, which exceeds ninety-two (92) dB(A) between a.m. and p.m. daily or sixty-five (65) dB(A) between p.m.
Building permits are required for all structures with the exception of a structure that is less than 200 square feet with no electrical, plumbing or mechanical.
The legislation and regulations in Malaysia governing building and fire safety are the Street, Drainage and Building Act, 1974; the Uniform Building By-Laws, 1984; and the Fire Services Act, 1988.