You will need forms for the various permits that are required. Keep in mind, filling out these worksheets and forms is NOT equivalent to applying for a permit.As documented in the January 2011 PIA Update, the NOC does not: (1) actively seek PII;. The NOC targeted audiences must conform to the format and content requirements specified in the. B. PURPOSE OF THE EIR. I-1. Great Lakes Wave Runup Model. The Moab and Salt Lake Helitack maintain STEP Programs. (2020); Perkins Tina (2020). Most of the reservoir levels and in the Great Salt Lake.