The City of Miami Building department enforces building activity that includes unsafe structures, work without existing or active permits, demolitions, and more. To contact the Unsafe Structures Division, you may email unsafestructures@miamigov or call 305-416-1177.

The city allows construction to take place Monday - Saturday from 8 AM to 6PM. If you need to work during prohibited hours or on a Sunday/federal holiday you must obtain a Noise Waiver permit before proceeding. Read the below carefully.

The applicant may request, in writing, an extension to a process number by emailing a letter to RER-SPA@miamidade with an explanation demonstrating the application was not abandoned and was being pursued in good faith.

Submittals will be accepted using the Plans Status & Application Portal and/or in person. For in person submittals, documents will be converted into electronic format. The plan review will be completed electronically by multiple departments simultaneously, thus expediting the permitting process.

By dialing 311 or 305-468-5900 (outside Miami-Dade County), you can receive personalized customer service in English, Spanish or Haitian Creole. The 311 Contact Center is open Monday through Friday from 7 a.m. to 7 p.m. and Saturday from 8 a.m. to 5 p.m., while closed on Sundays and holidays.

Documents are recorded at the Clerk of the Courts, MIAMI-DADE COUNTY RECORDER, COURTHOUSE EAST, 22 N.W. First Street, 1st Floor, Miami, FL 33128. You can record the Notice of Commencement by mail. The original Notice should be sent to the County Recorder, P.O. Box 011711, Flagler Station, Miami, Florida 33101.

How long will it take to issue my permit? Pursuant to the Florida Building Code, processing of permits is performed within a maximum of 30 working days after the plans and / or specifications are submitted and are reviewed in date order.

No. Painting, carpeting, tile work, replacement of cabinetry and drywall repair in single family residential homes is considered cosmetic and does not require a permit.

Major repairs and renovations (eg, redoing a bathroom or kitchen, putting on a new roof, replacing an entire driveway, replacing standard windows with impact windows, re-plumbing or rewiring the whole house) also require permits.