Construction does not occur between the hours of p.m. and a.m. during the months of June through September; and 2. Construction does not occur between the hours of p.m. and a.m. during the months of October through May.
Noise between 7 a.m. – 6 p.m. weekdays and 9 a.m. – 6 p.m. weekends is generally permitted in the City of Santa Clara. Construction is not allowed on Sundays or holidays.
Construction noise is covered by Chapter 12.08. 440 in Title 12 of the County Codes. Most construction must take place between a.m. and p.m. during normal weekdays. However, emergency repairs may be performed as necessary.
Permitted Construction/Demolition Hours are as follows: Monday through Friday A.M. - P.M. Saturday or National Holidays A.M. - P.M. To report a non-allowable working hour's noise complaint, contact The LAPD at 311 or click here.
SITE IMPROVEMENTS AND SMALL STRUCTURES: Detached accessory structures of 120 square feet or less and that will not be electrically wired 17. Driveways and walkways not crossing over a basement and not exceeding 30 inches above grade.
Homeowners in all residential areas can have a 6 foot high side yard and rear yard wall or fence. Front yard fences can be 3' in height if they are solid. If they are 'open work, they may be up to 4' in height. The Zoning Code requires a front yard setback for all residential zones.
The noise ordinance for Riverside County prohibits construction within 0.25 mile of an occupied residence unless it occurs between the hours of a.m. and p.m. (June through September) or between the hours of a.m. and p.m. (October through May).
A permit is required before constructing, enlarging, altering, repairing, or demolishing a building or structure or installing or altering any equipment which is regulated by the model codes adopted by the County of Riverside.
Construction permits can usually be issued within two months of submittal if the application and plans are complete, and the applicant responds promptly to all requests for additional information.