In ance with the Current edition of The Florida Building Code, the following items are exempt from permitting: Floor coverings such as tile or carpet. Minor cabinetry which does not include any electrical or plumbing fixtures. Minor drywall repairs. Painting. Portable Heating or cooling appliances.
A permit is required for a wide variety of construction, remodeling and repair work, including residential permits, commercial permits, Manufacturing plants, and accessory installations.
If you are pulling permits in a Broward County municipality, you must contact the municipality for their requirements. State of Florida licensed contractors must be registered with our office to pull permits in ​Unincorporated Broward County and Fort Lauderdale International Airport.
Minor Construction or Maintenance Work: Work such as installation of water meters (up to two (2) inches) at existing service laterals, cable splice pits not in or within two (2) feet of a roadway, street light or traffic signal maintenance, or similar types of work may be done without permit or prior notice to the ...
The Florida Building Code requires a Building Permit to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to , , enlarge, alter, repair, remove, convert, or replace any impact-resistant coverings, electrical, gas, mechanical or plumbing system, the ...
Per the Florida Building Code, sheds 200 square feet or less and used exclusively for storage purposes are exempt from permitting requirements.
The Dwelling Unit Water Heater Replacement Form must be used in addition to the Broward County Uniform Building Permit Application when a water heater permit is applied for.
Mandatory bid amount means the dollar amount at which the formal invitation to bid or negotiate, or request for proposals process is required unless exemption is provided in this code. The mandatory bid amount is $30,000.00.