Required Forms for 60D-4 Rules (Florida Life-Cycle Cost Analysis Program):. Contractor will have 120 days to complete the work.All construction shall be in compliance with the 2014 Florida Building Code, Building,. Contractor will have 60 days to complete the work. All construction shall be in compliance with the current requirements, 2020 or 2023 Florida.