The Leasing Entities recognize that CCC adjusts the amount of the water its members receive under their shares throughout each Irrigation Season based on water. Independent irrigation companies usually do free bids.Does anyone have a round about number for what a system costs? It'd be for a 3500 sq ft yard that's basically a rectangle, nothing special. All new construction is required to have both a culinary and secondary water meter installed at the time of construction. Before taking the state licensing exam, all landscaping contractor applicants must complete 25 hours of pre-licensure education. (1) "Agreement" means a short-term agreement or a long-term agreement. Bluffdale City is currently installing secondary water meters on all pressurized irrigation connections, in accordance with Utah House Bill 242.