Contractor Work Project With Flowers In Santa Clara

State:
Multi-State
County:
Santa Clara
Control #:
US-00462
Format:
Word; 
Rich Text
Instant download

Description

This form is a Construction Contract. The form contains the following subjects: scope of work, work site, and insurance. The contractor's warranty is limited to defects in workmanship within the scope of the work performed by the contractor.


What is a Construction contract agreement?


If you’re planning to build, renovate or reconstruct your house, you will need to enter into a contract for home construction with the building contractor, defining your mutual rights and responsibilities. This agreement contains project specifics, the contractor’s license and insurance details, the requested scope of work, etc. It may also determine the potential lien on the property should the work not be paid in full.


Types of construction contracts


Depending on the payment arrangements determined by parties, there are four basic types of home builders’ contracts:


1. Fixed price (or lump-sum) agreements set the price for the completed job right from the start. Although fixed, the document may also include provisions defining penalties (for example, if the constructor fails to finish the work on schedule).


2. Cost plus construction agreements set the price for the finished work based on building materials and labor with additionally mentioned “plus” (a percentage of the total costs or a fixed fee).


3. Time and material agreements set the price for the work without a “plus,” but the client pays the contractor a daily or hourly rate while they are under contract.


4. Unit-price agreements are standard in bidding, particularly for federal building projects. Both owner and contractor define the price that the contractor charges for a standard unit without any specific extra fees for other units.


The first two types of contract for home construction mentioned are the most popular ones. Let’s take a closer look at them.


Fixed price vs. cost-plus contract benefits


The fixed price agreement benefits owners more than builders, as it determines at the moment the parties seal the deal the exact price the contractor will get after they complete all the work. Builders risk not getting the estimated profits they initially anticipated, as expenses may increase significantly but remain the constructor’s responsibility.


The cost-plus construction deal contains the evaluation of the final project cost; however, it doesn’t determine the final contract price until the contractor completes all the work. Unlike the fixed-price agreement, it separates expenses and sets the profit rate (as a percentage of the final project cost or as a flat amount), so contractors prefer this type of agreement; it is riskier for homeowners.


Information you should provide in the construction contract agreement


The presented Construction Contract for Home is a universal multi-state construction contract template. This sample describes typical terms for a home building contract. Download a printable document version from our website or amend and fill it out online. Make sure to provide the following information:


• Name and contact details of the contractor and their license number;


• Name and contact details of the homeowner;


• Property legal description from county clerk’s records;


• Project description with blueprints and building specifications;


• Scope, description of work, and its estimated final dates;


• Costs of work and responsibilities of parties for any breach of contract.

Free preview
  • Form preview
  • Form preview

Form popularity

FAQ

For longer driveways, there shall be at least 100-feet of driveway at 15% or less gradient between each 300-foot section that exceeds 15%. The installation of gates or other barricades across driveways shall comply with Santa Clara County Fire Department's Standard G-1.

Reporting Unlicensed Activity The best way to let CSLB know about unlicensed activity on an active job site is by completing the SWIFT Lead Referral form.

For single-family residential properties, fences are generally limited to three (3) feet in height in the required front yard or street. Behind the required front yards and corner street side yards, fences are generally limited to six (6) feet in height with one (1) foot of open/non-solid lattice material on top.

Under California's Building Code, you must obtain a permit before building a fence that will be over 6 feet tall unless the top 2 feet of the fence will be barbed wire. For a front yard fence, the maximum height is 42 inches. For a backyard fence, the maximum height is 72 inches.

While the maximum height for fences in Santa Clara is 6 feet, there are several exceptions to this rule. These exceptions include: – Fences can be up to 8 feet if the fence is located in the rear yard of a residential property and is used to screen a recreational facility, pool, or hot tub.

More info

Apply to Seasonal Retail Sales Associate, Retail Sales Associate, Delivery Driver and more! Apply to Florist, Senior Account Manager, Crew Leader and more!You can also visit the portal to view current and upcoming business opportunities and information on awarded contracts even if you choose not to register. Can I remove a street tree? Can I remove a tree on my property?

Trusted and secure by over 3 million people of the world’s leading companies

Contractor Work Project With Flowers In Santa Clara