This form may be used when a change needs to be made to the original contract between a subcontractor and contractor. The change order works to amend the original contract. The example provided is only signed by the subcontractor and contractor, not the owner. This indicates that in this situation the contractor MAY be the owner's representative.
Oklahoma Change Order for Construction or Repairs by Contractor is a legal document used to modify the terms and conditions of an existing construction or repair contract in the state of Oklahoma. This change order allows contractors to request changes in the scope of work, design, materials, or timeline, among other aspects, during the course of a construction project. It ensures that any changes required by the contractor are properly documented and approved by both parties involved. The purpose of an Oklahoma Change Order for Construction or Repairs by Contractor is to provide a systematic method for contractors to request changes and adjustments to the original contract. By using this document, both the contractor and the client can ensure that any modifications are made with mutual understanding and agreement. This helps avoid potential disputes or disagreements that may arise due to modifications made without proper documentation. There can be different types of Oklahoma Change Orders for Construction or Repairs based on the nature of the change being made. Some common types of change orders include: 1. Scope Change Order: This type of change order is used when there is a need to alter the project's scope of work. It may involve adding, removing, or modifying certain tasks or deliverables. 2. Schedule Change Order: When modifications are required to the project timeline, a schedule change order is used. This could be due to delays, unforeseen circumstances, or revised completion dates. 3. Design Change Order: If there is a need to modify the original design or specifications of the project, a design change order is issued. This could involve changes in materials, dimensions, or overall aesthetics. 4. Cost Change Order: In case there are changes that impact the project's cost, a cost change order is utilized. This may include additional expenses for unexpected discoveries, design changes, or variations in material prices. Each type of change order should clearly state the reason for the modification, the section(s) of the original contract being affected, a detailed description of the change, any associated costs or time extensions, and the signatures of both parties involved. To ensure compliance with Oklahoma state laws and regulations, it is advisable to consult with a legal professional or follow any specific guidelines provided by the Oklahoma Construction Industries Board (CIA). In summary, an Oklahoma Change Order for Construction or Repairs by Contractor allows for changes to be made to an existing construction or repair contract in a documented and transparent manner. It helps avoid misunderstandings between the contractor and client and serves as a valuable tool to ensure successful project completion.
Oklahoma Change Order for Construction or Repairs by Contractor is a legal document used to modify the terms and conditions of an existing construction or repair contract in the state of Oklahoma. This change order allows contractors to request changes in the scope of work, design, materials, or timeline, among other aspects, during the course of a construction project. It ensures that any changes required by the contractor are properly documented and approved by both parties involved. The purpose of an Oklahoma Change Order for Construction or Repairs by Contractor is to provide a systematic method for contractors to request changes and adjustments to the original contract. By using this document, both the contractor and the client can ensure that any modifications are made with mutual understanding and agreement. This helps avoid potential disputes or disagreements that may arise due to modifications made without proper documentation. There can be different types of Oklahoma Change Orders for Construction or Repairs based on the nature of the change being made. Some common types of change orders include: 1. Scope Change Order: This type of change order is used when there is a need to alter the project's scope of work. It may involve adding, removing, or modifying certain tasks or deliverables. 2. Schedule Change Order: When modifications are required to the project timeline, a schedule change order is used. This could be due to delays, unforeseen circumstances, or revised completion dates. 3. Design Change Order: If there is a need to modify the original design or specifications of the project, a design change order is issued. This could involve changes in materials, dimensions, or overall aesthetics. 4. Cost Change Order: In case there are changes that impact the project's cost, a cost change order is utilized. This may include additional expenses for unexpected discoveries, design changes, or variations in material prices. Each type of change order should clearly state the reason for the modification, the section(s) of the original contract being affected, a detailed description of the change, any associated costs or time extensions, and the signatures of both parties involved. To ensure compliance with Oklahoma state laws and regulations, it is advisable to consult with a legal professional or follow any specific guidelines provided by the Oklahoma Construction Industries Board (CIA). In summary, an Oklahoma Change Order for Construction or Repairs by Contractor allows for changes to be made to an existing construction or repair contract in a documented and transparent manner. It helps avoid misunderstandings between the contractor and client and serves as a valuable tool to ensure successful project completion.