Wisconsin Surface Easement (For Meter Station)

State:
Multi-State
Control #:
US-OG-1156
Format:
Word; 
Rich Text
Instant download

Description

This form is a surface easement for meter station.

A Wisconsin Surface Easement for a Meter Station is a legally binding agreement that grants a right to access and use a specific area of land for the purposes of installing, operating, and maintaining a meter station related to various forms of utility, such as gas, oil, water, or electricity. This easement allows utility companies or other entities to effectively measure and regulate the flow of these resources. A Surface Easement is a type of easement that specifically pertains to the use of land's surface for the designated purpose, while the owner of the land still retains ownership of the property. It is critical to secure such an easement when constructing a meter station as it guarantees unobstructed access to the infrastructure necessary for metering and monitoring the utility services accurately. The Wisconsin Surface Easement for Meter Stations is typically granted for a predetermined period, which can vary depending on the negotiated terms. During this period, the easement holder has the right to access the designated area, construct any necessary structures, operate the metering devices, and perform regular maintenance. There are several types of Wisconsin Surface Easements applicable to Meter Stations: 1. Permanent Easements: These easements are typically granted when the utility company or entity requires long-term access to the land for the construction and maintenance of the meter station. A permanent easement provides ongoing, uninterrupted rights to the designated area. 2. Temporary Easements: Temporary easements are granted for a specific period and allow the easement holder to access the land for a limited time. These types of easements are commonly used during construction or maintenance phases of a meter station. Once the agreed period ends, the rights granted under a temporary easement cease to exist. 3. Construction Easements: Construction easements are acquired to facilitate the installation of new meter stations or the expansion of existing ones. This type of easement allows temporary use of the land during the construction phase to complete necessary activities like laying utility lines, setting up structures, or establishing access roads. 4. Maintenance Easements: Maintenance easements are obtained to ensure routine upkeep and repairs of the meter station and its related infrastructure. These easements offer the right to access the land as required for inspection, maintenance, or repairs of the metering equipment or support structures. In summary, a Wisconsin Surface Easement for a Meter Station grants the holder the legal right to access and use a specific area of land for the purpose of constructing, operating, and maintaining a meter station associated with utility services such as gas, oil, water, or electricity. Different types of easements, including permanent, temporary, construction, and maintenance easements, may be required depending on the specific context and duration of the project.

Free preview
  • Preview Surface Easement (For Meter Station)
  • Preview Surface Easement (For Meter Station)

How to fill out Surface Easement (For Meter Station)?

If you want to complete, down load, or printing legitimate record web templates, use US Legal Forms, the greatest variety of legitimate types, which can be found on-line. Take advantage of the site`s basic and convenient lookup to discover the papers you will need. Various web templates for enterprise and individual reasons are sorted by categories and suggests, or keywords. Use US Legal Forms to discover the Wisconsin Surface Easement (For Meter Station) within a few click throughs.

Should you be currently a US Legal Forms buyer, log in for your profile and click on the Down load switch to obtain the Wisconsin Surface Easement (For Meter Station). Also you can access types you in the past delivered electronically in the My Forms tab of your own profile.

If you use US Legal Forms the first time, follow the instructions below:

  • Step 1. Be sure you have chosen the form for the right area/country.
  • Step 2. Utilize the Preview choice to look over the form`s information. Do not forget about to see the information.
  • Step 3. Should you be unhappy with all the type, use the Look for industry on top of the display screen to discover other models in the legitimate type format.
  • Step 4. After you have found the form you will need, go through the Purchase now switch. Select the costs prepare you prefer and put your accreditations to register for an profile.
  • Step 5. Process the purchase. You can utilize your bank card or PayPal profile to accomplish the purchase.
  • Step 6. Pick the formatting in the legitimate type and down load it on your own product.
  • Step 7. Total, edit and printing or sign the Wisconsin Surface Easement (For Meter Station).

Each legitimate record format you purchase is yours permanently. You have acces to every single type you delivered electronically inside your acccount. Go through the My Forms segment and decide on a type to printing or down load again.

Compete and down load, and printing the Wisconsin Surface Easement (For Meter Station) with US Legal Forms. There are millions of specialist and state-particular types you may use for your personal enterprise or individual requires.

Form popularity

FAQ

Utility Easement ? It allows a utility company or local municipality to access your property for things such as power lines, water lines, utility boxes, etc. Private Easement ? Private easement rights are granted to an individual. A property owner might grant a neighbor access to a body of water through their property. The Most Important Things to Know about Easement Rights in Wisconsin dewittllp.com ? news ? 2021/04/15 ? the-most-im... dewittllp.com ? news ? 2021/04/15 ? the-most-im...

The distinguishing end result between a prescriptive easement and adverse possession is that, unlike adverse possession, a prescriptive easement does not transfer legal ownership to the claimant. Instead, it merely confers upon the claimant a legal right to jointly use the property in conjunction with the true owner.

For example, Johnny bought property that did not have access to a public road, but he used the private gravel road of his neighbor to reach a public road for ten years. A court may grant him a prescriptive easement if the owner of the other property did not ask him to stop using the private road.

A prescriptive easement can be created by: Continuously using the property for 5 years; In a manner that is open, notorious, and clearly visible to the owner of the land; and. Hostile and adverse to the owner.

Under the common law, a party's use of another's real property becomes a prescriptive right upon: 1) an adverse use; 2) that is visible, open, and notorious; 3) under an open claim of right; and 4) continuous for 20 years.

An easement deed can be acknowledged in this state before a notary public; a judge, clerk, or deputy clerk of a court of record; a court commissioner; a register of deeds or deputy register of deeds; a municipal judge; or a county clerk or deputy county clerk (706.07). Wisconsin Easement Deed Forms - Deeds.com deeds.com ? forms ? easement-deed deeds.com ? forms ? easement-deed

Electric and natural gas utility easement guidelines Lots with minimal vegetation along lot lines and relatively even terrain should have a utility easement of a 8-foot-wide strip along each side of each lot and a 15-foot-wide strip along rear of each lot. Easements - We Energies We Energies ? partners ? builders ? e... We Energies ? partners ? builders ? e...

Public easement allows use of the land for public use, such as for a sidewalk or grass parkway. A prescriptive easement allows use of the property for a specific period of time. What are Easement Rights in Wisconsin? - Moen Sheehan Meyer moensheehanmeyer.com ? blog ? what-are-... moensheehanmeyer.com ? blog ? what-are-...

Interesting Questions

More info

Fill in the date of conveyance and name of Landowner and Easement Holder; use full legal names and indicate status of parties. For corporations, check to sure ... Jun 19, 2015 — Any release of rights document that is created for the highway improvement project needs to include all easements, both occupied and unoccupied.Sample Form Download · Amendment to Easement (Powerline Easement) · Approval of Clean Up (Electric Transmission Line Construction) · Cultural Resources Agreement ( ... The Public Service Commission of Wisconsin (PSC or Commission) offers this overview to landowners who must negotiate easement contracts with transmission owners ... Include on the face of your plat the easement provisions that appear on the We Energies Utility Easement Provisions sticker, along with a key that identifies ... Signatures of the grantors of the easement documents must be exactly as they appear on the previous documents confirming their capacity in which they hold title ... Zoom into your neighborhood using your mouse wheel or type in your street name in the search tool. Click on your desired deeds and easement to return ... A minimum ten-foot wide drainage easement (five feet on each side of the property line) shown along all joint property lines on the plat. Such easement shall be ... Apr 15, 2021 — If you are looking to establish an easement on a Wisconsin property, it is best to have an attorney draft or review your documents before ... ... easement. A. The City's standard width for sanitary sewer easements is 20 ft. for a single utility, plus 10 ft. for each additional utility within the easement.

Trusted and secure by over 3 million people of the world’s leading companies

Wisconsin Surface Easement (For Meter Station)