Miami-Dade Florida Contract for Design and Construction of Manufacturing Facility

State:
Multi-State
County:
Miami-Dade
Control #:
US-01502BG
Format:
Word; 
Rich Text
Instant download

Description

This form is a contract for the design and construction of a manufacturing facility that will be engaged in a particular manufacturing process. This form is a generic example that may be referred to when preparing such a form for your particular state. It is for illustrative purposes only. Local laws should be consulted to determine any specific requirements for such a form in a particular jurisdiction.

Miami-Dade Florida Contract for Design and Construction of Manufacturing Facility is a legal agreement that governs the process of designing and constructing a manufacturing facility within Miami-Dade County, Florida. This contract ensures that all parties involved in the project, including the owner, designer, and contractor, fulfill their obligations and responsibilities to successfully complete the manufacturing facility in accordance with the specified design and construction requirements. Keywords relevant to this topic include Miami-Dade County, contract, design and construction, manufacturing facility, legal agreement, obligations, responsibilities, owner, designer, contractor, specifications, and requirements. There are several types of Miami-Dade Florida Contracts for Design and Construction of Manufacturing Facility, namely: 1. Lump Sum Contract: This type of contract stipulates a fixed price for the entire project. The contractor agrees to complete the design and construction of the manufacturing facility for a predetermined sum of money. 2. Cost-Plus Contract: In a cost-plus contract, the owner agrees to reimburse the contractor for the actual costs incurred during the design and construction process. Additionally, a predetermined fee or profit margin may be added to the reimbursable costs. 3. Design-Build Contract: This comprehensive contract combines the design and construction phases into a single agreement. The owner hires a design-build team that assumes responsibility for both the facility's design and construction. 4. Guaranteed Maximum Price (GMP) Contract: With this type of contract, the owner agrees to pay the contractor based on the actual costs of construction, plus a pre-determined fee. The contract sets a maximum price beyond which the contractor is not entitled to claim additional compensation for completing the manufacturing facility. 5. Construction Management at Risk (CAR) Contract: Under this contract, the construction manager assumes the risk for project completion within a fixed budget and schedule. The owner hires a construction management firm that provides both design and construction services, ensuring efficient coordination throughout the project. These various types of contracts offer flexibility in terms of pricing, risk allocation, and project execution while ensuring that the design and construction of the manufacturing facility in Miami-Dade County are completed in compliance with local regulations and industry standards.

Miami-Dade Florida Contract for Design and Construction of Manufacturing Facility is a legal agreement that governs the process of designing and constructing a manufacturing facility within Miami-Dade County, Florida. This contract ensures that all parties involved in the project, including the owner, designer, and contractor, fulfill their obligations and responsibilities to successfully complete the manufacturing facility in accordance with the specified design and construction requirements. Keywords relevant to this topic include Miami-Dade County, contract, design and construction, manufacturing facility, legal agreement, obligations, responsibilities, owner, designer, contractor, specifications, and requirements. There are several types of Miami-Dade Florida Contracts for Design and Construction of Manufacturing Facility, namely: 1. Lump Sum Contract: This type of contract stipulates a fixed price for the entire project. The contractor agrees to complete the design and construction of the manufacturing facility for a predetermined sum of money. 2. Cost-Plus Contract: In a cost-plus contract, the owner agrees to reimburse the contractor for the actual costs incurred during the design and construction process. Additionally, a predetermined fee or profit margin may be added to the reimbursable costs. 3. Design-Build Contract: This comprehensive contract combines the design and construction phases into a single agreement. The owner hires a design-build team that assumes responsibility for both the facility's design and construction. 4. Guaranteed Maximum Price (GMP) Contract: With this type of contract, the owner agrees to pay the contractor based on the actual costs of construction, plus a pre-determined fee. The contract sets a maximum price beyond which the contractor is not entitled to claim additional compensation for completing the manufacturing facility. 5. Construction Management at Risk (CAR) Contract: Under this contract, the construction manager assumes the risk for project completion within a fixed budget and schedule. The owner hires a construction management firm that provides both design and construction services, ensuring efficient coordination throughout the project. These various types of contracts offer flexibility in terms of pricing, risk allocation, and project execution while ensuring that the design and construction of the manufacturing facility in Miami-Dade County are completed in compliance with local regulations and industry standards.

Free preview
  • Form preview
  • Form preview
  • Form preview
  • Form preview
  • Form preview

Trusted and secure by over 3 million people of the world’s leading companies

Miami-Dade Florida Contract for Design and Construction of Manufacturing Facility