Miami-Dade Florida Change Order for Construction or Repairs by Contractor

State:
Multi-State
County:
Miami-Dade
Control #:
US-01675-AZ
Format:
Word; 
Rich Text
Instant download

Description

This form may be used when a change needs to be made to the original contract between a subcontractor and contractor. The change order works to amend the original contract. The example provided is only signed by the subcontractor and contractor, not the owner. This indicates that in this situation the contractor MAY be the owner's representative. Miami-Dade Florida Change Order for Construction or Repairs by Contractor refers to a formal document that outlines modifications or adjustments made to a construction or repair project in Miami-Dade County, Florida. A change order is typically initiated by the contractor or may be requested by the project owner, architect, or engineer in response to unforeseen circumstances, design modifications, or additional work needed to complete the project. There are several types of change orders that may be encountered in Miami-Dade County, Florida, including: 1. Scope Change Order: A scope change order is issued when there is a change in the project's scope of work. This could include additions, deletions, or alterations to the original project plans, specifications, or drawings. 2. Cost Change Order: A cost change order is used to modify the contract price due to various factors, such as market price fluctuations, unanticipated expenses, or changes in project requirements. It outlines the adjustments made to the contract sum, including any increases or reductions in costs. 3. Time Change Order: A time change order is issued when there is a need to extend or compress the project schedule. This could be due to unforeseen delays, weather conditions, or changes in project milestones. The time change order specifies the revised timeline and any associated impacts on the project schedule. 4. Material Change Order: A material change order is utilized when there is a need to substitute or replace specific materials or equipment specified in the original project documents. This may be necessary due to availability issues, code compliance requirements, or changes in project design. 5. Design Change Order: A design change order is initiated when there are modifications or revisions to the original project design. This could include alterations to layout, structural components, or other design elements that require a change in the construction or repair process. Each change order must be documented, approved, and signed by the appropriate parties involved, including the contractor, project owner, and any relevant consultants or stakeholders. It is crucial to maintain accurate documentation of change orders to ensure transparency and accountability throughout the construction or repair project in Miami-Dade County, Florida. In conclusion, Miami-Dade Florida Change Order for Construction or Repairs by Contractor is a comprehensive tool used to document and formalize any modifications or adjustments made to a construction or repair project within the county. The different types of change orders, such as scope, cost, time, material, and design change orders, allow for efficient management of unforeseen circumstances, project requirements, and necessary adjustments to ensure successful project completion.

Miami-Dade Florida Change Order for Construction or Repairs by Contractor refers to a formal document that outlines modifications or adjustments made to a construction or repair project in Miami-Dade County, Florida. A change order is typically initiated by the contractor or may be requested by the project owner, architect, or engineer in response to unforeseen circumstances, design modifications, or additional work needed to complete the project. There are several types of change orders that may be encountered in Miami-Dade County, Florida, including: 1. Scope Change Order: A scope change order is issued when there is a change in the project's scope of work. This could include additions, deletions, or alterations to the original project plans, specifications, or drawings. 2. Cost Change Order: A cost change order is used to modify the contract price due to various factors, such as market price fluctuations, unanticipated expenses, or changes in project requirements. It outlines the adjustments made to the contract sum, including any increases or reductions in costs. 3. Time Change Order: A time change order is issued when there is a need to extend or compress the project schedule. This could be due to unforeseen delays, weather conditions, or changes in project milestones. The time change order specifies the revised timeline and any associated impacts on the project schedule. 4. Material Change Order: A material change order is utilized when there is a need to substitute or replace specific materials or equipment specified in the original project documents. This may be necessary due to availability issues, code compliance requirements, or changes in project design. 5. Design Change Order: A design change order is initiated when there are modifications or revisions to the original project design. This could include alterations to layout, structural components, or other design elements that require a change in the construction or repair process. Each change order must be documented, approved, and signed by the appropriate parties involved, including the contractor, project owner, and any relevant consultants or stakeholders. It is crucial to maintain accurate documentation of change orders to ensure transparency and accountability throughout the construction or repair project in Miami-Dade County, Florida. In conclusion, Miami-Dade Florida Change Order for Construction or Repairs by Contractor is a comprehensive tool used to document and formalize any modifications or adjustments made to a construction or repair project within the county. The different types of change orders, such as scope, cost, time, material, and design change orders, allow for efficient management of unforeseen circumstances, project requirements, and necessary adjustments to ensure successful project completion.

Trusted and secure by over 3 million people of the world’s leading companies

Miami-Dade Florida Change Order for Construction or Repairs by Contractor