Charlotte North Carolina Pipeline Right of Way With Grantee Selecting Course

State:
Multi-State
City:
Charlotte
Control #:
US-OG-331
Format:
Word; 
Rich Text
Instant download

Description

This form is used when Grantor grants and conveys to Grantee a Right of Way and Easement (the "Right of Way") on which to lay, repair, maintain, operate, and remove pipelines and replace existing lines with other lines for the transportation of oil or gas, and their products, water, or any other fluid or substance. Grantee shall have the right to install valves, fittings, meters, and similar appurtenances as may be necessary or convenient to the operation of the lines installed by Grantee, and to erect, repair, maintain, operate, patrol and remove electric lines, graphite and steel anodes, and other devices for the control of pipeline corrosion, over, through, on, under, and across the lands descibed within.

Trusted and secure by over 3 million people of the world’s leading companies

Charlotte North Carolina Pipeline Right of Way With Grantee Selecting Course